ESB Energy A1 Falloden Way Northbound
ESB Energy · 20 The Market Place, Falloden Way, London, NW11 6JJ
1 of 1 available
50 kW rapid · 1 charge point · CCS, CHAdeMO
Price TBC · not confirmed for this site yet
100.0% reliable over the last 30 days
Status from ESB Energy, checked just now. This page updates itself while it’s open.
Directions: Google Maps (opens in a new tab) · Apple Maps (opens in a new tab)
Charge points
| Charger | Now | Power | Connectors | Price | In use | Reliability (30 days) |
|---|---|---|---|---|---|---|
| UT094B | Available since 23 Nov 2026, 22:29 |
50 kW | CCS, CHAdeMO | Price TBC | 9% 3.5 a day |
100.0% |
"Since" is when we first saw the current status."Price TBC" means we don't yet have a price for this site that we can confirm. About prices.
How busy it gets
Over the last 12.7 days the charger here was in use 9.2% of the time, about 3.5 sessions a day, typically 37 minutes. How we measure usage.
About this site
- Network
- ESB Energy
- Area
- Hampstead Garden Suburb, Barnet · all chargers in Barnet
- Opening hours
- Open 24 hours
- Listed since
- 11 Nov 2026, 10:10 (when we started reading this network)
Nearby chargers
-
ESB Energy A1 Falloden Way Southbound 50 kW rapid · 1 charge point · CCS, CHAdeMO · Price TBC1 of 1 available 100.0% reliable (30 days)
-
15 Hutchings walk 5.1 kW slow · 1 charge point · Type 2 · 39p–59p/kWh1 of 1 available 100.0% reliable (30 days)
-
side house 37 Litchfield Way 5.1 kW slow · 1 charge point · Type 2 · 39p–59p/kWh1 of 1 available 97.9% reliable (30 days)
-
outside house number 101 5.1 kW slow · 1 charge point · Type 2 · 39p–59p/kWh1 of 1 available 100.0% reliable (30 days)
-
outside house number 9 5.1 kW slow · 1 charge point · Type 2 · 39p–59p/kWh1 of 1 available 100.0% reliable (30 days)
-
40 Middleway 5.1 kW slow · 1 charge point · Type 2 · 39p–59p/kWh1 of 1 available 100.0% reliable (30 days)
-
ubitricity, Ossulton Way 5 kW slow · 1 charge point · Type 2 · 46p–68p/kWh1 of 1 available 100.0% reliable (30 days)
-
19 Hill Top 5.1 kW slow · 1 charge point · Type 2 · 39p–59p/kWh1 of 1 available 100.0% reliable (30 days)