Rapid EV chargers in Eastwood
3 public charge points at 1 site in Eastwood. 100% are working right now.
available now all in use out of order status not published
How busy chargers are in Eastwood
Over the last 8.5 days, rapid chargers in Eastwood were in use 8% of the time, about 1.3 sessions a day per charger, typically 89 minutes. That covers the networks that publish when a charger is in use. How we measure usage.
Busiest sites
- IKEA Nottingham GRIDSERVE · in use 8% of the time
Rapid charging sites, fastest first
-
IKEA Nottingham 60 kW rapid · 3 charge points · CCS, CHAdeMO, Type 2 · 85p/kWh3 of 3 available 99.0% reliable (30 days)
Networks in Eastwood
- GRIDSERVE 1 site
Nearby towns
- Heanor 3 sites
- Kimberley 3 sites
- Ilkeston 5 sites
- Hucknall 8 sites
- Ripley 2 sites
- Kirkby-in-Ashfield 8 sites
- Stapleford 4 sites
- Sandiacre 3 sites
Status is each operator's own, usually a few minutes old. Reliability is the share of the last 30 days a site's chargers were working or in use when we checked; how we measure it. This page updates itself while it’s open.