Uniper Cottam Development Centre Power Station
bp pulse · Uniper Cottam Development Centre Power Statio, Retford, DN22 0TF
1 of 2 available
7.4 kW fast · 2 charge points · Type 2
Price TBC · not confirmed for this site yet
50.0% reliable over the last 30 days, 1 outage of 10 minutes or more
Status from bp pulse, checked just now. This page updates itself while it’s open.
Directions: Google Maps (opens in a new tab) · Apple Maps (opens in a new tab)
Charge points
| Charger | Now | Power | Connectors | Price | In use | Reliability (30 days) |
|---|---|---|---|---|---|---|
| PB0008986 | Available since 22 Nov 2026, 19:26 |
7.4 kW | Type 2 | Price TBC | 35% 0.7 a day |
100.0% |
| PB0009247 | Out of order since 16 Nov 2026, 16:23 |
7.4 kW | Type 2 | Price TBC | measuring | 0.0% · 1 outage |
"Since" is when we first saw the current status."Price TBC" means we don't yet have a price for this site that we can confirm. About prices.
How busy it gets
Over the last 5.5 days the charger here was in use 34.7% of the time, about one session every 2 days, typically 10 hours. How we measure usage.
About this site
- Network
- bp pulse
- Area
- Cottam, Bassetlaw · chargers outside the towns of Bassetlaw
- Nearest town
- Gainsborough, about 10 km away as the crow flies
- Listed since
- 16 Nov 2026, 16:23 (when we started reading this network)
Nearby chargers
-
Pod Point Robinsons' Corner 7 kW fast · 4 charge points · Type 2 · about 48p/kWh2 of 4 available 49.4% reliable (30 days)
-
CO-OP Sturton by Stow 50 kW rapid · 2 charge points · CCS, CHAdeMO · 89p/kWh2 of 2 available 100.0% reliable (30 days)
-
Pod Point Tesco Superstore - Gainsborough 50 kW rapid · 5 charge points · CCS, CHAdeMO, Type 2 · about 44p–62p/kWh4 of 5 available 100.0% reliable (30 days)
-
Savoy Cinema Gainsborough 22 kW fast · 3 charge points · Type 2 · Price TBCStatus unknown 100.0% reliable (30 days)
-
Lidl Retford 22.1 kW fast · 4 charge points · Type 2 · Price TBC2 of 4 available 100.0% reliable (30 days)
-
Morrisons Retford 50 kW rapid · 2 charge points · CCS · 59p/kWh1 of 2 available 96.8% reliable (30 days)
-
Shell Retford 150 kW ultra-rapid · 9 charge points · CCS, CCS, CHAdeMO · 89p/kWh6 of 9 available 98.7% reliable (30 days)
-
Chancery Lane Car Park, 11 Chancery Lane 50 kW rapid · 1 charge point · CCS · 89p/kWhOut of order 0.0% reliable (30 days)