ESB Energy Shenley Green Shopping Centre (Outside 4 Shenley Lane), Birmingham
ESB Energy · Shenley Green Shopping Centre (Outside 4 Shen, Birmingham, B29 4HH
2 of 2 available
50 kW rapid · 2 charge points · CCS, CHAdeMO
Price TBC · not confirmed for this site yet
100.0% reliable over the last 30 days
Status from ESB Energy, checked just now. This page updates itself while it’s open.
Directions: Google Maps (opens in a new tab) · Apple Maps (opens in a new tab)
Charge points
| Charger | Now | Power | Connectors | Price | In use | Reliability (30 days) |
|---|---|---|---|---|---|---|
| UB0A33 | Available since 22 Nov 2026, 12:02 |
50 kW | CHAdeMO | Price TBC | 0% | 100.0% |
| UB0A33 | Available since 22 Nov 2026, 12:02 |
50 kW | CCS | Price TBC | 0% | 100.0% |
"Since" is when we first saw the current status."Price TBC" means we don't yet have a price for this site that we can confirm. About prices.
How busy it gets
Over the last 10.7 days the chargers here were in use 0% of the time. How we measure usage.
A picture of the busiest hours appears once we have 14 days of history. We have 10.7 so far.
About this site
- Network
- ESB Energy
- Area
- Shenley Fields, Birmingham · all chargers in Birmingham
- Opening hours
- Open 24 hours
- Listed since
- 11 Nov 2026, 10:10 (when we started reading this network)
Nearby chargers
-
Pod Point The Woodlands 7 kW fast · 2 charge points · Type 2 · about 62p/kWhOut of order 0.0% reliable (30 days)
-
Pod Point The Woodlands 7 kW fast · 6 charge points · Type 2 · about 62p/kWh1 of 6 available 16.7% reliable (30 days)
-
ESB Energy 762 Bristol Road South Birmingham 22 kW fast · 2 charge points · Type 2 · Price TBC2 of 2 available 100.0% reliable (30 days)
-
ESB Energy Lockwood Rd Car Park, Birmingham 50 kW rapid · 6 charge points · CCS, CHAdeMO, Type 2 · Price TBC6 of 6 available 100.0% reliable (30 days)
-
ubitricity, Selly Oak Road 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWh1 of 1 available 100.0% reliable (30 days)
-
ubitricity, Selly Oak Road 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWh1 of 1 available 100.0% reliable (30 days)
-
ubitricity, Selly Oak Road 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWh1 of 1 available 100.0% reliable (30 days)
-
ubitricity, Selly Oak Road 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWhAll in use 100.0% reliable (30 days)