ESB Energy Lancaster Gate
ESB Energy · Lancaster Gate, Bayswater, London, W2 3NP
1 of 1 available
50 kW rapid · 1 charge point · CCS, CHAdeMO
Price TBC · not confirmed for this site yet
100.0% reliable over the last 30 days
Status from ESB Energy, checked just now. This page updates itself while it’s open.
Also listed here: ubitricity lists ubitricity, Lancaster Gate at the same spot (27 m away), with 2 charge points of up to 5 kW.
They may be the same chargers listed by both networks, older ones since replaced, or a second set. We show each listing as its network publishes it.
Directions: Google Maps (opens in a new tab) · Apple Maps (opens in a new tab)
Charge points
| Charger | Now | Power | Connectors | Price | In use | Reliability (30 days) |
|---|---|---|---|---|---|---|
| UT09ED Taxi-Only | Available since 22 Nov 2026, 19:45 |
50 kW | CCS, CHAdeMO | Price TBC | 21% 9.4 a day |
100.0% |
"Since" is when we first saw the current status."Price TBC" means we don't yet have a price for this site that we can confirm. About prices.
How busy it gets
Over the last 10.7 days the charger here was in use 21% of the time, about 9.4 sessions a day, typically 32 minutes. How we measure usage.
About this site
- Network
- ESB Energy
- Area
- Bayswater, City of Westminster · all chargers in City of Westminster
- Opening hours
- Open 24 hours
- Listed since
- 11 Nov 2026, 10:10 (when we started reading this network)
Nearby chargers
-
ubitricity, Lancaster Gate 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWh1 of 1 available 100.0% reliable (30 days)
-
ubitricity, Lancaster Gate 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWh1 of 1 available 100.0% reliable (30 days)
-
ubitricity, Lancaster Gate 5 kW slow · 2 charge points · Type 2 · 45p–67p/kWh2 of 2 available 100.0% reliable (30 days)
-
ubitricity, Lancaster Gate 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWh1 of 1 available 100.0% reliable (30 days)
-
ubitricity, Lancaster Gate 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWhAll in use 100.0% reliable (30 days)
-
ubitricity, Lancaster Gate 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWh1 of 1 available 100.0% reliable (30 days)
-
ubitricity, lancaster gate, Opposite 107 5 kW slow · 2 charge points · Type 2 · 45p–67p/kWh2 of 2 available 100.0% reliable (30 days)
-
ubitricity, Craven Hill 5 kW slow · 1 charge point · Type 2 · 45p–67p/kWh1 of 1 available 100.0% reliable (30 days)