ESB Energy 37 Croydon Road (A232 Eastbound), West Wickham
ESB Energy · 37 Croydon Road, West Wickha, London, BR4 9HZ
2 of 2 available
50 kW rapid · 2 charge points · CCS, CHAdeMO, Type 2
Price TBC · not confirmed for this site yet
100.0% reliable over the last 30 days
Status from ESB Energy, checked just now. This page updates itself while it’s open.
Directions: Google Maps (opens in a new tab) · Apple Maps (opens in a new tab)
Charge points
| Charger | Now | Power | Connectors | Price | In use | Reliability (30 days) |
|---|---|---|---|---|---|---|
| UT041Y | Available since 22 Nov 2026, 17:49 |
50 kW | CCS, CHAdeMO | Price TBC | 8% 3.1 a day |
100.0% |
| UT041Y | Available since 22 Nov 2026, 17:49 |
43 kW | Type 2 | Price TBC | 3% 0.3 a day |
100.0% |
"Since" is when we first saw the current status."Price TBC" means we don't yet have a price for this site that we can confirm. About prices.
How busy it gets
Over the last 10.7 days the chargers here were in use 5.1% of the time, about 1.7 sessions a day per charger, typically 44 minutes. How we measure usage.
A picture of the busiest hours appears once we have 14 days of history. We have 10.7 so far.
About this site
- Network
- ESB Energy
- Area
- Coney Hall, Bromley · all chargers in Bromley
- Opening hours
- Open 24 hours
- Listed since
- 11 Nov 2026, 10:10 (when we started reading this network)
Nearby chargers
-
Lidl West Wickham 7.4 kW fast · 6 charge points · Type 2 · 55p/kWhOut of order 0.0% reliable (30 days)
-
Lidl West Wickham 7.4 kW fast · 2 charge points · Type 2 · 55p/kWhOut of order 0.0% reliable (30 days)
-
29 West Wickham High Street 50 kW rapid · 2 charge points · CCS, CHAdeMO · Price TBCOut of order 0.0% reliable (30 days)
-
97 West Wickham 50 kW rapid · 2 charge points · CCS · Price TBC2 of 2 available 97.9% reliable (30 days)
-
MFG West Wickham 50 kW rapid · 1 charge point · CCS · 59p/kWh1 of 1 available 93.1% reliable (30 days)
-
MFG Eden Park 50 kW rapid · 2 charge points · CCS, CHAdeMO · 59p/kWh2 of 2 available 91.6% reliable (30 days)
-
LON-New Addington 50 kW rapid · 3 charge points · CCS, CHAdeMO, Type 2 · 74p/kWhOut of order 0.0% reliable (30 days)
-
Addington SF Connect 150 kW ultra-rapid · 2 charge points · CCS · Price TBC2 of 2 available 96.0% reliable (30 days)