EV charging points in Poole

41 public charge points at 13 sites in Poole, 23 of them rapid (50 kW or more). 92% are working right now and 3 are out of order.

Rapid chargers only (7 sites)

free now all in use out of order status not published

Charging sites, fastest first

  1. MFG Creekmoor MFG EV Power · Stanley Green 150 kW ultra-rapid · 8 charge points · CCS, CHAdeMO
    7 of 8 free 70.5% reliable (7 days)
  2. Story Lane Car Park Be.EV · Broadstone 150 kW ultra-rapid · 5 charge points · CCS, CHAdeMO
    4 of 5 free 95.8% reliable (7 days)
  3. Seldown Lane Be.EV · Poole 75 kW rapid · 2 charge points · CCS, CHAdeMO
    Out of order 0.0% reliable (7 days)
  4. Lagland Street Service Area Be.EV · Old Town 50 kW rapid · 2 charge points · CCS
    1 of 2 free 100.0% reliable (7 days)
  5. Old Orchard Be.EV · Old Town 50 kW rapid · 2 charge points · CCS, CHAdeMO
    2 of 2 free 83.7% reliable (7 days)
  6. Prosperous Street Car Park Be.EV · Old Town 50 kW rapid · 2 charge points · CCS
    2 of 2 free 100.0% reliable (7 days)
  7. Upton Country Park Welcome Centre Be.EV · Upton 50 kW rapid · 4 charge points · CCS, Type 2
    4 of 4 free 100.0% reliable (7 days)
  8. Lake Pier Car Park Be.EV · Ham Hill 22 kW fast · 2 charge points · Type 2
    2 of 2 free 100.0% reliable (7 days)
  9. Lytchett Matravers Recreational Ground Be.EV · Lytchett Matravers 22 kW fast · 2 charge points · Type 2
    2 of 2 free 100.0% reliable (7 days)
  10. SAFI Valves Ltd Mer UK · Holton Heath 22 kW fast · 2 charge points · Type 2
    Status unknown Reliability: measuring
  11. Serpentine Lane Be.EV · Poole 22 kW fast · 2 charge points · Type 2
    1 of 2 free 100.0% reliable (7 days)
  12. Swimming Pool Car Park Be.EV · Poole 22 kW fast · 4 charge points · Type 2
    4 of 4 free 100.0% reliable (7 days)
  13. Heights Approach Be.EV · Upton 7 kW fast · 4 charge points · Type 2
    3 of 4 free 100.0% reliable (7 days)

Networks in Poole

Nearby towns

Status is each operator's own, usually a few minutes old. Reliability is the share of the last 7 days a site's chargers were working or in use when we checked; how we measure it.