EV charging points in Hessle
11 public charge points at 6 sites in Hessle, 4 of them rapid (50 kW or more). 91% are working right now and 1 is out of order.
free now all in use out of order status not published
Charging sites, fastest first
-
Wingfield Farm (Hessle) 75 kW rapid · 4 charge points · CCS4 of 4 free 100.0% reliable (7 days)
-
East Riding of Yorkshire Council - Swinegate Car Park 7.4 kW fast · 3 charge points · Type 22 of 3 free 66.4% reliable (7 days)
-
The ERGO 6.9 kW slow · 1 charge point · Type 21 of 1 free 100.0% reliable (7 days)
-
The ERGO 6.9 kW slow · 1 charge point · Type 21 of 1 free 100.0% reliable (7 days)
-
The ERGO 6.9 kW slow · 1 charge point · Type 21 of 1 free 100.0% reliable (7 days)
-
The ERGO 6.9 kW slow · 1 charge point · Type 21 of 1 free 100.0% reliable (7 days)
Networks in Hessle
- Clenergy EV 4 sites
- EVYVE 1 sites
- Mer UK 1 sites
Nearby towns
- Barton-upon-Humber 2 sites
- Cottingham 12 sites
- Kingston upon Hull 44 sites
- Beverley 14 sites
- Hedon 3 sites
- Immingham 2 sites
- Brigg 4 sites
- Scunthorpe 13 sites
Status is each operator's own, usually a few minutes old. Reliability is the share of the last 7 days a site's chargers were working or in use when we checked; how we measure it.