Mid Argyll Swimming Pool

ChargePlace Scotland · Lochgilphead, Oban Road, PA31 8NG

Status unknown
22 kW fast · 2 charge points · Type 2
Reliability: we're still measuring (it needs 6 hours of status)
Status from ChargePlace Scotland, checked 6 minutes ago.

Directions (opens in a new tab) · OpenStreetMap (opens in a new tab)

Charge points

ChargerNowPowerConnectorsReliability (7 days)
APT51555 Status not published
since 9 Nov 2026, 23:25
22 kW Type 2 measuring
APT51555 Status not published
since 9 Nov 2026, 23:25
22 kW Type 2 measuring

"Since" is when we first saw the current status. Prices are not shown yet: they're coming as we read each operator's tariff data.

About this site

Network
ChargePlace Scotland
Area
Lochgilphead, Argyll and Bute · all chargers in Lochgilphead
Listed since
9 Nov 2026, 23:25 (when we started reading this network)

Nearby chargers

  1. Lorne Street Car Park, Lochgilphead ChargePlace Scotland · Lochgilphead · 0.6 miles 22 kW fast · 4 charge points · Type 2
    Status unknown Reliability: measuring
  2. Lochgilphead Service Point ChargePlace Scotland · Lochgilphead · 0.6 miles 22 kW fast · 2 charge points · Type 2
    Status unknown Reliability: measuring
  3. The National Galleries of Scotland - Edinburgh Evolt (SWARCO E.Connect) · Tighnabruaich · 10.6 miles 7 kW fast · 2 charge points · Type 2
    2 of 2 free 100.0% reliable (7 days)
  4. Tarbert Ferry Terminal ChargePlace Scotland · Tarbert · 12.4 miles 50 kW rapid · 3 charge points · CCS, CHAdeMO, Type 2
    Status unknown Reliability: measuring
  5. Tighnabruaich ChargePlace Scotland · Tighnabruaich · 12.5 miles 50 kW rapid · 5 charge points · CCS, CHAdeMO, Type 2
    Status unknown Reliability: measuring
  6. Campbeltown Road Car Park ChargePlace Scotland · Tarbert · 12.6 miles 22 kW fast · 2 charge points · Type 2
    Status unknown Reliability: measuring
  7. Loch Melfort Hotel, Oban Evolt (SWARCO E.Connect) · Arduaine · 13.8 miles 22 kW fast · 2 charge points · Type 2
    Status unknown Reliability: measuring
  8. Kennacgaig Ferry Terminal Evolt (SWARCO E.Connect) · Whitehouse · 16.6 miles 50 kW rapid · 3 charge points · CCS, CHAdeMO, Type 2
    3 of 3 free 97.0% reliable (7 days)